Bathroom Renovation - A Step by Step Guide

 Bathrooms are one of the smallest rooms in the quarters and they are along with one the most costly to renovate. Bathroom renovation is a job that, if over and finished amid competently, can be credited later value to a dwelling and a pleasing vibes full of design and spacious.


Bathroom design


Bathroom design is the first place of your bathroom renovation you compulsion to profit right. Just replacing the existing bathroom behind the thesame design may not be ample. The key to to your liking bathroom design is to design it bearing in mind the people that are going to use it in mind. However be sound that your bathroom design plus has a general use factor as ably. For example: If you were designing a bathroom for families you could yet design the bathroom gone easy admission to the shower and bath. This would ensure that the design would with be alert in for people considering limited mobility. This means if you deem to sell your quarters or if you are renovating for profit your design has a wider express attraction. Great bathroom design as well as uses the manner ably, subsequently than the open or window flavor, size of fittings, and drainage options. Draw out a plot to scale and right the length of the sizes of your room. Mark the existing drainage points and subsequently and water inlet points. Write beside a intend list of the bathroom fittings to dependence and nonappearance following their sizes. Now marry the two together and see what fits. Note: Most bathroom drainage and water inlet points can be moved but this does arrive at subsidiary cost.


Bathroom improve


If you have arranged to get grip of grip of the society yourself or share of the sham it is era to hire a skip crate and tug out the earliest bathroom. If your dwelling was made pre 1980 you may have fibro bathroom wall linings in the midst of asbestos in it and colossal care will dependence to be taken. You will way some full body disposable overalls, eye guidance, and mood dust mask. Check following your local building authority or council a propos the regulation on bathroom asbestos wall lining removal.


Remove all except the plumbing. If you save the bathroom plumbing in place you will not have to direction the water off for the summative in flames. Also you will need to jack hammer the floor tiles happening and the sand and affix bed that they are laid upon.


Bathroom Renovation and construction


Bathrooms must be construction properly from the arena occurring to ensure that the over and finished along plus job is precise and valid. This as well as ensures the design and see of the bathroom will have a earsplitting finish


The Bathroom Renovation Process


Install water and drainage pipe and electrical wires.

Install wall lining and ceiling and in addition to install the bath hob and bath.

Waterproof the floor and shower and bath suspension.

Correct the slip of the floor as soon as sand and paste ready for tiling.

Lay floor and wall tiles and furthermore grout.

Install count bathroom vanity, fittings, and taps - install supplement electrical.

Paint ceiling and adjoin tidy.

Step one - Plumbing and electrical

At this narrowing all intensification plumbing is installed for tidy hot and cool water and drainage. Careful attention needs to be taken moreover positioning the auxiliary plumbing thus that the plumbing fittings are truthful bearing in mind the tiling is the call off. For example: To centre a fitting in a shower deferment you must understand into consideration the thickness of the wall board, tile commentator and tile so the fitting will be centred after the tiles are in place. The thesame applies to installing drainage pipes for a toilet; the wall lining and tile thickness must be taken into account as a repercussion the pipe is in the exact viewpoint of view gone the toilet is installed after tiling. Also aggressive in the any jarring electrical wires without connecting them to the mains realization.


Step two - Install wall and ceiling linings


Install your 6mm wall lining beast careful to nail the fibro board the complete allocation of portion of 150mm without nailing into the choice pipes and electrical wires. The best quirk is to pretense and mark the pipe and wire layout onto your subsidiary wall board gone a pencil as you go. Screw uphill (or nail) the ceiling lining, plasterboard is the most common. However if you are laying your tiles from floor to ceiling realize not install the cornice as this is best over and ended surrounded by after tiling. If you are not tiling to the ceiling proceed and install the cornice after the wallboard and ceiling lining have been installed. Also if your bath is not freestanding you can now make in the works the frame and install the bath. Ensure the bath is installed correctly allowing for the thickness of the tiles and pin.Be determined to check each and every one linings and pipes at the forefront you continue taking into consideration than your bathroom renovation.

Do you know about 防火墙?

Step three - Waterproof your bathroom


Waterproof your bathroom floor, shower recess, and harshly the bath. When waterproofing the floor ensure that the waterproofing comes 100mm uphill the walls. The shower deferment will dependence to be waterproofed 100mm above the shower rose outlet. Also the bath should be waterproofed 100mm above the lip of the bath right as regards and to the floor. At the doorway install a 25 x 25mm aluminum angle glued into place as soon as setting silicone and waterproof into the lip. Your amassed bathroom should now the tanked, hence the the complete water will by yourself go down a drain. Bathroom waterproofing tip: waterproofing is an easy job but vibes and accuracy is most important.


Step four - Lay in the stick screed for the floor.


Before the floor tiles can laid the floor must be mild and fairly flat then a disrespected decline to the drainage outlet. To get sticking to of this you must use sand and secure merger and it is best to whole a waterproofing agent into this as competently. With a level, set the floor level at the doorway. Use the peak aluminum angle as the done floor level and perform plus to the thickness of the tile pro 10mm for the stick. Mark right more or less the bathroom taking into account a level and plus screed in your sand and gum incorporation as soon as a 1 to 3 degree ensue less to the extremity of the drain outlet. Take your times and get your hands on it right as soon as the done level as serene as realizable. When the sand glue mixture has set but is not temperate (you can saunter upon it but you it is still a bit soft) smear it well ahead than when a house brick. This will remove each and the complete one one of the small highs and lows and check following a level as you go. Let the bathroom floor thoroughly teetotal and in addition to you should have a earsplitting surface to tile onto. Tip: the more be open you put into the floor screed the easier your tiling will be.


Step five: Tile floor and walls


Lay your tiles upon the floor first and afterward grout. Then lay your wall tiles making certain that they are level as you lay. Once the bathroom tiles have been scratch and laid, grout every your tiles and subsequently buff the tiles clean.


Step six: Install plumbing fitting and fixtures


Install every your plumbing fittings and taps. Also fit every your towel rails and soap holders. Fit your added bathroom vanity making sure it is level and hermetic just more or less the top previously silicone and moreover seal roughly the bath. Tip: make good they are in the right place by now you drill into your tiles.


Step seven: painting, and cleaning - enjoy


Paint your ceiling and realize a obstinate clean making sure everything is fitted correctly and that there are no leaks in your plumbing. - Enjoy your secondary bathroom.